Last update: 8 May
All abstracts can be downloaded here (zip).
15 May 2008 |
![]() |
08:30 |
Registration Desk Opened / Badges and Dinner Tickets Distribution |
09:00 |
Joint Meeting Opening |
09:20 |
Abstract Applications of Parametrics: a Historical Perspective Shermon, D. Price Systems (United Kingdom) |
10:00 |
|
10:40 |
Break |
11:00 |
Abstract USAF/SMC Space Program Cost Growth via Engineering Change Order Study Vu, A. MCR LLC (United States) |
11:40 |
Abstract An Assessment of the Inherent Optimism in Early Conceptual Designs and its Effect on Cost and Schedule Growth Bitten, R.1; Bearden, D.1; Emmons, D.1; Freaner, C.2 1The Aerospace Corporation (United States); 2NASA Headquarters - SMD (United States) |
12:20 |
Lunch break |
13:30 |
Abstract New Challenges for Cost Analysts - Creating Technical Baselines for Point Estimates Toas, S.1; Frisbie, J.P.1; Thomas, D.D.2 1Northrop Grumman - TASC (United States); 2Air Force Cost Analysis Agency (United States) |
14:10 |
|
14:50 |
Abstract Probabilistic and Possibilistic Approaches for taking into Account the Uncertainty in Cost Estimating Foussier, P. 3f (France) |
15:30 |
Break |
15:50 |
Transit to CDF |
16:00 |
CDF Presentation |
19:30-21:00 |
SSCAG Dinner at ESTEC |
16 May 2008 |
08:30 |
Registration Desk Opened |
09:00 |
Abstract Adaptive Cost-Estimating Relationships Broder, M.1; Book, S.2 1Aerospace Corp (United States); 2MCR Inc (United States) |
09:40 |
Abstract Cost Estimation for Secure Software & Systems Colbert, E.; Boehm, B. University of Southern California (United States) |
10:20 |
Abstract Space Hardware Cost Improvement Curve Update MacKenzie, D.W.; Parlanti, M.L. Wyle (United States) |
11:00 |
Break |
11:20 |
|
12:00 |
Abstract Uncertainty to Probability for Cost with Duration Estimating Relationships (CDERs) Ross, M. r2Estimating, LLC (United States) |
12:40 |
Lunch break |
13:40 |
|
14:20 |
Closing from the Steering Group |